Euripus Bridge

Euripus Bridge

Owner: Ministry of Public Works
Location: Chalkis
Construction: HELLENIC TECHNODOMIKI SA
Construction Period: 1985 – 1993
Total Length: 695 m
Maximum Span: 215 m
Maximum Pylon Heigth: 90 m
Construction Method: Balanced cantilever method
Deck: Prestressed slab
Piers: Reinforced concrete, variable box section
Foundation: Piles
Services: Complete design, camber design, technical support
Comments:
4th biggest span in Greece, probably the thinnest bridge worldwide, 1st cable-stayed bridge in Greece, assignment after competition