domi-ae.gr - Main Section

domi-ae.gr - Main Component

Metsovo Bridge

Metsovo Bridge

Owner: EGNATIA ODOS SA
Location: Metsovo
Construction: AKTOR SA
Construction Period: 2004 - 2008
Total Length: 538 m
Maximum Span: 235 m
Maximum Pylon Heigth: 102.8 m
Construction Method: Balanced cantilever method
Deck: Prestressed, box section
Piers: Reinforced concrete, box section
Foundation: Shafts Ø12 m, active depth till 25 m
Services: Complete design, camber design, technical support, construction consultant
Comments:
Among the 15 biggest cantilever bridges worldwide, 1st in Greece, Design in common with LAP GmbH

domi-ae.gr - Bottom info