domi-ae.gr - Main Component
Metsovo Bridge
Owner:
EGNATIA ODOS SA
Location:
Metsovo
Construction:
AKTOR SA
Construction Period:
2004 - 2008
Total Length:
538 m
Maximum Span:
235 m
Maximum Pylon Heigth:
102.8 m
Construction Method:
Balanced cantilever method
Deck:
Prestressed, box section
Piers:
Reinforced concrete, box section
Foundation:
Shafts Ø12 m, active depth till 25 m
Services:
Complete design, camber design, technical support, construction consultant
Comments:
Among the 15 biggest cantilever bridges worldwide, 1st in Greece, Design in common with LAP GmbH