Votonosi Bridge
Owner:
EGNATIA ODOS SA
Location:
Votonosi
Construction:
MICHANIKI SA
Construction Period:
2001 – 2005
Total Length:
490 m
Maximum Span:
230 m
Maximum Pylon Heigth:
53.3 m
Construction Method:
Balanced cantilever method
Deck:
Prestressed, box section
Piers:
Reinforced concrete, box section
Foundation:
Shafts Ø10 m, active depth till 25 m
Services:
Complete design, camber design, technical support, construction consultant
Comments:
Among the 20 biggest cantilever bridges worldwide, 2nd in Greece