domi-ae.gr - Main Component
Extension of Kymis Avenue from Kifisia to the Olympic Village
Owner:
Ministry of Public Works
Location:
Ministry of Public Works Location Athens
Construction:
AKTOR SA
Construction Period:
2003 ¸ 2004
Total Length:
300 m
Maximum Span:
60 m
Μέγιστο Ύψος Βάθρου:
24,65 m
Construction Method:
Προώθηση
Deck:
Composite section
Piers:
Reinforced concrete, box section
Foundation:
Piles
Services:
Complete design, technical support
Comments:
Deck launching with part of the pre-slabs